For a home around 1500sqft we typically try to keep things around this schedule. Sometimes things like weather or unforseen things can make a project take a little longer.
- Preparation (1-2 days):
- Cleaning: 0.5-1 day
- Surface repairs: 0.5-1 day
- Masking: 0.5 day
- Priming (1 day):
- Applying primer: 1 day
- Painting (2-4 days):
- Applying first coat of paint: 1-2 days
- Drying time between coats: 0.5-1 day
- Applying second coat of paint (if needed): 1-2 days
- Cleanup and Final Touches (1 day):
- Removing masking tape and plastic coverings: 0.5 day
- Touching up missed spots: 0.5 day
- Cleaning up tools and equipment: 0.5 day
Total Estimated Time: 5.5-8 days
These time estimates are averages and can vary based on factors such as the size and complexity of the home, the condition of the surfaces, the type of paint being used, and the efficiency of the painting crew. It's essential to plan for additional time if unexpected issues arise or if you encounter challenging weather conditions that may delay the painting process. If you need any painting services call now for a FREE Quote!